Wi-Fi 7 migration readiness
Wi-Fi 7 Readiness Assessment
Wi-Fi 7 introduces new capabilities across 6 GHz, MLO, and higher throughput — but it also raises new requirements on cabling, PoE, switching capacity, and RF design. A readiness assessment evaluates whether the current infrastructure can support it.
What it is
A Wi-Fi 7 readiness assessment reviews the wired and wireless infrastructure that supports Wi-Fi, and identifies which elements are ready, which require investment, and which require redesign to move to Wi-Fi 7.
The assessment covers cabling category, PoE budgets, switching capacity and uplinks, controller and platform readiness, 6 GHz RF planning, AP placement, and capacity requirements.
The output is a clear readiness view and a phased migration roadmap that aligns with refresh cycles, budgets, and business priorities.
How it works
- Step 01
Discovery
Review current wireless environment, wired infrastructure, and business drivers for Wi-Fi 7.
- Step 02
Infrastructure Assessment
Assess cabling, PoE, switching, controllers, and platform readiness for Wi-Fi 7.
- Step 03
RF Design Review
Review 6 GHz planning, AP placement, and capacity against Wi-Fi 7 design requirements.
- Step 04
Roadmap & Recommendations
Deliver a readiness report and phased migration roadmap aligned to refresh and budget cycles.
What the assessment includes
Cabling Assessment
Reviews cabling category, length, and structured cabling readiness for Wi-Fi 7 access points.
PoE Readiness
Evaluates PoE class, per-port and switch-level budgets, and PoE requirements of Wi-Fi 7 APs.
Switching Capacity
Assesses uplink capacity, port speeds, and switch architecture supporting the wireless edge.
6 GHz Readiness
Reviews 6 GHz channel planning, spectrum availability, and regulatory considerations.
RF Redesign & AP Placement
Evaluates whether the existing RF design and AP placement remain valid for Wi-Fi 7.
Capacity Planning & Roadmap
Sizes capacity for Wi-Fi 7 devices and applications and defines a phased migration roadmap.
When a readiness assessment is recommended
- Planning a wireless refresh in the next 12 to 24 months
- New construction and greenfield deployments
- Environments introducing Wi-Fi 7 client devices
- High-density and real-time application environments
- Multi-site programs requiring phased migration planning
- Budgeting and capital planning for Wi-Fi 7
Explore other services
Wi-Fi 7 readiness leads directly into design and migration work.